New construction plumbing installation in northern Utah
New construction plumbing is the piping and fixtures for a building that is going up. It covers the underground lines, the rough-in inside the framing, and the finish work. Call when you have plans to price. You or your builder runs the project, and we do the plumbing, across northern Utah. Estimates are free.
- Free estimate
- Price before work
- 1-year guarantee
What to expect
The price before any work starts
A free estimate first. No surprise on the bill.
You know who is coming
A text with your plumber's name before we arrive
We show up when we say
If we are running late, you hear from us first
No upsell. No is fine.
We fix what you called about. You decide anything else.
What does new construction plumbing include?
New construction plumbing is every pipe and fixture in a building that is going up. It goes in over four phases, and the plumber comes back as the building gets ready for each one.
- Underground. Before the slab or basement floor is poured, the drain and sewer piping goes in under it. The water service and the building sewer are brought from the lot's connections to the building.
- Rough-in. Once the framing is up, the drain, waste, and vent piping and the water lines go into the walls and floors. Tubs and shower valves are set.
- Top-out. The vent pipes go up through the roof. Many crews count this as the end of the rough-in.
- Finish. After drywall, cabinets, counters, and flooring, the toilets, sinks, faucets, and water heater are set and connected.
The building department inspects the work between phases. Plumbing for a leased commercial space that is being fitted out is tenant improvement plumbing.
Not sure it is the right fit? Call and describe your house.
What is a plumbing rough-in, and what is inspected before the walls close?
A plumbing rough-in is all the piping that ends up hidden inside the walls, floors, and ceilings. It goes in after framing and before insulation and drywall. Nothing is covered until the piping is tested and an inspector has signed off.
- Drain, waste, and vent piping. It is put under test, most often filled with water, and has to hold with no leaks.
- Water lines. They are put under pressure and have to hold.
- Gas piping. A gas line is tested under pressure with a gauge.
- The inspector's visit. The inspector checks pipe sizes, slopes, supports, and vents against the approved plans and the code.
Cities name these inspections differently. Eagle Mountain's building department lists "Underground Plumbing (sub-rough)" and then a "4-Way" inspection that covers plumbing, HVAC, electrical, framing, permanent power, and gas, ahead of the insulation inspection (source).
What does the plumber need from the builder before starting?
Before starting a new construction job, the plumber needs enough to price the plumbing and to put the pipe in the right place the first time.
- The plans. Floor plans at least, and the plumbing sheets if an architect or engineer drew them.
- The fixture schedule. Which tubs, shower valves, toilets, sinks, and appliances are going in. A shower valve goes into the wall at rough-in, so it has to be chosen early.
- The utilities. Where the water and sewer reach the lot, how deep they are, and where the meter sits.
- Water heating and gas. The type and location of the water heater, and every gas appliance.
- The schedule. When the slab is poured, when framing ends, and when drywall starts.
- The permit. Who applies for the plumbing permit and who meets the inspector.
Call when you have the plans, and tell us about the job.
Rather ask a person? Call and we will answer it.
What plumbing does an addition or an accessory dwelling unit need?
An addition, a detached garage with a bathroom, or an accessory dwelling unit ties new plumbing into a system that was sized for the building as it stood. Four things shape the job.
- The sewer. The new drains need enough fall to reach the existing sewer line. If they sit lower than the line, a sewage ejector pump lifts the waste. A sewer camera inspection shows the condition of the old line before more is tied into it.
- The water service. The line from the meter has to carry the added fixtures without starving the ones already there.
- Hot water. The existing water heater may not keep up, or the new space may be too far from it. Provo City says that under Utah's plumbing code every water heater must have thermal expansion protection (source).
- A detached building. Its water, sewer, and gas lines are buried in a trench.
Ask the city what it requires for an accessory dwelling unit before the design is final.
Which plumbing code applies in Utah, and who inspects the work?
Utah sets its plumbing code statewide, by law, and local building departments enforce it. Utah Code 15A-2-103, in the version effective July 1, 2026, adopts the 2024 edition of the International Plumbing Code, the 2021 edition of the International Residential Code, and the 2024 edition of the International Fuel Gas Code, together with state and local amendments (source).
Which of those books covers your building depends on what the building is. The building department tells you when it reviews the plans.
The building department of the city where the building stands issues the permit and sends the inspector. In an unincorporated area, it is usually the county's department. The water or sewer provider may also want to see the connection to its main, and in some places that provider is a separate district.
Editions change. Ask the building department which code your permit falls under before the plans are final.
Rather ask a person? Call and we will answer it.
What affects the cost of new construction plumbing?
We give free estimates and do not post prices. These are the things that change the cost of new construction plumbing:
- Fixture count. Every bathroom, kitchen, laundry, and outdoor faucet adds pipe and labor.
- Layout. Bathrooms stacked above each other or back to back share piping. Fixtures spread across the building do not.
- What is under the floor. A slab, a basement, and a crawl space each change the underground work.
- Distance to the utilities. A long or deep run from the street means more trench and more pipe.
- Materials and fixtures. The pipe the plans call for, and the fixtures chosen.
- Water heating and gas. The type and number of water heaters, and how many gas appliances are piped.
- Changes. Moving a fixture after the rough-in means redoing finished work.
We tell you the cost before we start the work.
Want a number for your house? Estimates are free.
What should a builder plan for when plumbing a building in northern Utah?
Plumbing a new building in northern Utah means planning for cold ground, uneven water pressure, and often two water systems on one lot.
- Frost depth. Buried water lines go below the frost line. Summit County's building design criteria, effective July 1, 2026, list a frost line depth of 36 inches (source). Each city and county sets its own figure.
- Water pressure. Saratoga Springs says it is divided into 5 pressure zones, with pressure from 40 to 150 psi depending on where you live in a zone, and that current plumbing codes call for a pressure reducing valve in all new homes (source).
- Secondary water. American Fork says its pressurized irrigation water is non-potable and should never be used for drinking (source). The irrigation piping and the drinking water piping are never connected to each other.
- Sprinklers on drinking water. Layton City says a separate backflow preventer is required on all landscape sprinkler systems using culinary (drinking) water (source). Once installed, a testable assembly needs backflow testing.
| Phase | When it happens | What goes in |
|---|---|---|
| Underground | Before the slab or basement floor is poured | Drain and sewer piping under the floor, and the water and sewer lines to the building |
| Rough-in | After framing, before insulation | Drain, waste, and vent piping, water lines, tubs, and shower valves |
| Top-out | Once the roof deck is on | Vent pipes through the roof |
| Tests and rough inspection | Before insulation and drywall | Nothing new. The piping is tested and the inspector signs off |
| Finish | After drywall, cabinets, counters, and flooring | Toilets, sinks, faucets, and the water heater |
| Final inspection | When every fixture is set and working | Nothing new. The inspector checks the finished plumbing |
What it costs
Why we look before we quote
A leak behind a wall and a leak under a sink are different jobs, and so are a short gas line and a long one. We look at the work, then give you a price. The estimate is free.
- Where the leak or the line is, and how hard it is to reach
- How much pipe is replaced
- The length of a gas line and what it feeds
- Code upgrades the job needs
Larger jobs can be paid over time through Wisetack.
See financing optionsThe visit
What happens when you call
- 1
Call or book
Tell us what you see. If a pipe is leaking, we tell you which valve to close.
- 2
You know who is coming
You get a text with your plumber's name before we arrive. Shoe covers go on at the door.
- 3
A look and a price before any work
We find the cause, show you what we found, and give you the price.
- 4
You decide. We do the work.
We clean up, and the work is covered for 1 year.
1-year guarantee
If it is not right, we come back
100% satisfaction guarantee for 1 year after service
How the guarantee worksPlumbing questions
Is yours not here? Call (385) 338-6068 and ask. We would rather answer it than have you guess.
What kind of pipe is used in new construction plumbing?
Most new buildings use PEX or copper for the water lines and PVC or ABS plastic for the drains and vents. Gas piping is usually steel or flexible stainless steel tubing. Some commercial plans call for cast iron drains. The plans and the adopted code decide what is allowed, and the inspector checks the pipe against both.
Should I rough in a basement bathroom when the house is built?
Yes, if you may ever finish the basement. The drains for a future toilet, sink, and shower go under the basement floor before the concrete is poured, and they stay capped until you need them. Adding them later means breaking out the floor. If the basement floor sits below the sewer line, plan the pit for a sewage ejector pump at the same time.
Should a new home be plumbed for a water softener?
It is worth planning for where the water is hard. Provo's 2025 Water Report lists typical levels of 10–15 grains per gallon (source). A softener loop put in at rough-in gives a water softener a place to connect, with a drain nearby, and lets the outdoor faucets stay on untreated water. Adding the loop after the walls are closed is a bigger job.
Can I move in before the final plumbing inspection?
Plan on passing the final inspection first. Eagle Mountain's building department, for example, says certificates of occupancy are issued only after all inspections have been completed and passed, and that the water meter must be set before the final (source). Ask your own building department what its final inspection covers.
New Construction Plumbing across northern Utah
Based in Lehi, working in nine counties.
Related services
Tell us what is going on
Call or text and a person will answer. Estimates are free.
Office Mon to Fri, 7 am to 6 pm. Emergency line 24/7.


