Skip to main content
StormWaters Plumbing

Plumbing for kitchen and bath remodels in northern Utah

Remodel plumbing is the plumbing part of a kitchen, bathroom, or basement remodel. It means moving and adding water, drain, vent, and gas lines, then setting the fixtures. Call while the project is still being planned, whether you are the homeowner or the contractor on the job. We do remodel plumbing across northern Utah. Estimates are free.

  • Free estimate
  • Price before work
  • 1-year guarantee

What to expect

  • The price before any work starts

    A free estimate first. No surprise on the bill.

  • You know who is coming

    A text with your plumber's name before we arrive

  • We show up when we say

    If we are running late, you hear from us first

  • No upsell. No is fine.

    We fix what you called about. You decide anything else.

What does a plumber do in a remodel?

In a remodel, the plumber moves and adds the pipes the new layout needs, then connects the fixtures at the end. The work comes in two parts.

Rough-in, while the walls and floors are open:

  • Move or add hot and cold water lines.
  • Move or add drain lines, and the vent pipes that let the drains work.
  • Run a gas line to a range or another gas appliance.
  • Set the shower valve and the tub or shower drain.
  • Test the new piping before it is covered.

Finish, after tile, cabinets, and countertops are in:

  • Set the toilets, sinks, faucets, and shower trim.
  • Connect the dishwasher, the disposal, and the refrigerator water line.
  • Turn the water on and check every joint.

We do the plumbing and only the plumbing. Design, demolition, framing, tile, cabinets, drywall, and finish work stay with the homeowner or the general contractor running the job.

Not sure it is the right fit? Call and describe your house.

What plumbing does a kitchen remodel involve?

Kitchen remodel plumbing depends on what moves. A new sink and faucet in the same spot is a small job. A new layout means new pipe.

  • Moving the sink. The water lines, the drain, and the vent all follow the sink. A drain has to slope downhill to the main line, so a long move can mean opening the floor or the ceiling below.
  • An island sink. An island has no wall behind it to carry a vent pipe up. The drain runs under the floor, and the vent has to be built the way the plumbing code allows for an island.
  • A gas range. Changing from electric to gas, or moving the range, means a gas line sized for it.
  • A pot filler. A faucet over the stove needs a cold water line in that wall.
  • Dishwasher and refrigerator. Each needs a water line with a shut-off valve, and the dishwasher needs a drain connection.

Settle where the sink, range, and refrigerator go before the cabinets are ordered.

What plumbing does a bathroom remodel involve?

Bathroom remodel plumbing runs from new fixtures on the old pipes to a whole new layout. The drain work decides how big the job is.

  • Moving a toilet. A toilet uses the largest drain in the room. Moving it means a new drain line and floor flange, and the floor joists limit where that pipe can run.
  • Moving a shower or tub drain. The floor is opened, the drain and trap are moved, and the vent is checked.
  • A new shower valve. The valve sits inside the wall, so the time to replace it is while the wall is open.
  • Tub to shower. The drain usually moves to fit the new shower pan, and the valve and shower head are set at new heights.
  • A second sink. A double vanity needs water lines for both faucets and a drain connection that serves both bowls.

Keeping the toilet and the drains where they are is the simplest plan. When the fixtures stay put, we connect the new faucets, sinks, and showers to the existing lines.

Rather ask a person? Call and we will answer it.

What does it take to add a bathroom in a basement?

Adding a basement bathroom comes down to one question: can the drains flow downhill to the sewer line?

  • The rough-in is already there. Many unfinished basements were built with drain pipes for a future bathroom, capped off in the floor. If they are in the right spots, the new bathroom connects to them and little concrete is cut.
  • No rough-in, and the sewer line is below the floor. The concrete is cut, new drains are run to the main line, and the floor is patched.
  • The sewer line is above the floor. Gravity will not carry the waste out. A sewage ejector pump sits in a sealed pit in the floor and pumps the waste up to the main drain.

A basement bathroom also needs water lines and venting for each fixture. In Lehi, the city's Residential Basement Finish checklist lists a floor plan and "Electrical/Plumbing/Mechanical" among the items to submit for the permit (source).

When does the plumber come in during a remodel?

The plumber comes into a remodel before the walls open, while they are open, and again after the finishes are in.

  1. Planning. The plumber looks at the layout, finds the existing drains, vents, and water lines, and says what the new plan takes. A change costs the least at this point.
  2. Rough-in. After demolition and framing, and before insulation and drywall, the new water, drain, vent, and gas lines go in.
  3. Rough inspection. Where a permit applies, the inspector checks the piping while it can still be seen.
  4. Finish. After tile, cabinets, and countertops, the fixtures are set and tested.
  5. Final inspection. The inspector checks the finished work.

Inspections have to be booked ahead. Lehi City, for example, asks for 24 hours' notice for any type of inspection (source). Build that into the schedule so the drywall crew is not waiting on the plumbing.

Rather ask a person? Call and we will answer it.

Does a remodel need a plumbing permit in Utah?

Whether a remodel needs a plumbing permit is decided by the city or county building department for your address. Plan on one when the job moves or adds water, drain, vent, or gas lines.

The standard is statewide. Utah's State Construction Code adopts the 2021 International Residential Code, the 2024 International Plumbing Code, and the 2024 International Fuel Gas Code, with state and local amendments, as the standards for building construction, alteration, remodeling, and repair (source). Local building departments issue the permits and do the inspections.

Salt Lake City, for example, says no one may make any installation, alteration, or improvement to the plumbing system in a building without first obtaining the prescribed permits (source).

The permit is pulled before the work starts. The inspection puts a second set of eyes on drains, vents, and gas lines that no one will see again once the tile is up.

What affects the cost of remodel plumbing?

We give free estimates and do not post prices. These are the things that change the cost of remodel plumbing:

  • What moves. Fixtures that stay where they are take less plumbing than fixtures that move. A toilet or a kitchen sink across the room is the bigger job.
  • Access. Pipe in an open wall or an unfinished basement ceiling is easier to reach than pipe under a concrete slab.
  • Concrete. A basement bathroom with no rough-in means cutting and patching the floor, or an ejector pump.
  • Gas. A new gas line adds pipe, a pressure test, and an inspection.
  • The old pipe. Older homes may have galvanized steel water pipe or cast iron drains in the walls. The Census Bureau's 2020–2024 American Community Survey puts the median year built for housing at 1965 in Salt Lake City (source) and 1966 in Ogden (source). Worn pipe is easiest to replace while the walls are open.
  • Permits. Each city or county sets its own fee.

We tell you the cost before we start the work.

Common remodel changes and the plumbing each one takes
Change in the remodelPlumbing workWhat to plan for
Move the kitchen sinkNew water lines, drain, and vent to the new spotOpening the wall, the floor, or the ceiling below
Add an island sinkA drain under the floor and a vent built for an islandWork under the floor before the cabinets go in
Change to a gas rangeA gas line sized for the rangeA pressure test and an inspection
Move a toiletA new drain line and floor flangeOpening the floor; the joists limit the route
Change a tub to a showerA moved drain and a new shower valvePlumbing done before the shower pan and tile
Add a basement bathroomDrains under the slab, or an ejector pumpCutting concrete, unless a rough-in is there

What it costs

Why we look before we quote

A leak behind a wall and a leak under a sink are different jobs, and so are a short gas line and a long one. We look at the work, then give you a price. The estimate is free.

  • Where the leak or the line is, and how hard it is to reach
  • How much pipe is replaced
  • The length of a gas line and what it feeds
  • Code upgrades the job needs

Larger jobs can be paid over time through Wisetack.

See financing options

The visit

What happens when you call

  1. 1

    Call or book

    Tell us what you see. If a pipe is leaking, we tell you which valve to close.

  2. 2

    You know who is coming

    You get a text with your plumber's name before we arrive. Shoe covers go on at the door.

  3. 3

    A look and a price before any work

    We find the cause, show you what we found, and give you the price.

  4. 4

    You decide. We do the work.

    We clean up, and the work is covered for 1 year.

4.9

from 56 Google reviews

As of October 2026

Read all 56 reviews on Google Maps

If it is not right, we come back

100% satisfaction guarantee for 1 year after service

How the guarantee works

Recent jobs

Remodel Plumbing

MillcreekAugust 2026

Problem
A three-quarter bath in a basement was becoming a wet room, and the sink would not fit in the bathroom layout.
What we did
We moved the drain lines, replaced the floor drain in the ground with a new one, and installed a three-piece drain for the wet room. We moved the water lines and drain lines for the sink to just outside the bathroom door. All plumbing was installed to code.

Remodel Plumbing

MapletonJuly 2026

Problem
A toilet, a sink drain, and a shower valve needed to be moved, and a wet room needed a drain.
What we did
We moved the toilet about a foot over and ran the drain for the wet room. We raised the sink drain about 3 feet, rebuilt the stack to eliminate the other drain for the double sink, and moved the water lines to the new drain. We installed the customer-supplied shower valve on the opposite wall.

Remodel Plumbing

MurrayJune 2026

Problem
A home with polybutylene (poly) water piping needed a partial repipe, a new shower valve, and a customer-supplied tub and water heater installed.
What we did
We converted part of the poly piping to PEX, fishing new lines from the ceiling down into the cabinet spaces for the kitchen, the bathroom sinks, and the toilets, and ran a 1/4-inch ice maker line through the cabinets. We replaced the shower valve with a Moen Posi-Temp valve piped in PEX, moved the shower head up about 6 inches and centered it, and installed the tub with its own Moen Posi-Temp valve and a new waste and overflow with brushed nickel trim. We installed the water heater with a new expansion tank, a sediment drip leg, earthquake straps, new water and gas supply lines, and a 4-inch vent to bring it up to code, hauled away the old unit, and replaced the toilet flange.

Plumbing questions

Is yours not here? Call (385) 338-6068 and ask. We would rather answer it than have you guess.

What is a plumbing rough-in?

A plumbing rough-in is the stage when the pipes go in and the fixtures do not. The water lines, drains, vents, and any gas line are run through the open walls and floors and capped at each fixture's spot. The piping is tested, and inspected where a permit applies, before insulation and drywall cover it. The fixtures are set later, at the finish stage.

Can a toilet be moved to a different spot in the bathroom?

Yes, a toilet can be moved, but it is the hardest fixture in the bathroom to move. Its drain is the largest pipe in the room and has to slope downhill all the way to the main drain. The floor is opened, and the floor joists or the concrete slab decide where the pipe can run. The new spot also has to be within reach of a vent.

What is a sewage ejector pump?

A sewage ejector pump moves waste from fixtures that sit lower than the house's main drain, most often a basement bathroom. The toilet, sink, and shower drain into a sealed pit in the floor. When the pit fills to a set level, the pump pushes the waste up a pipe to the main drain. The pit has its own vent, and the pump needs power to work.

Should old pipes be replaced during a remodel?

Replace old pipe during a remodel when it is galvanized steel or polybutylene, or when it shows rust, leaks, or old patches. With the walls open, the pipe is in plain view and easy to reach, and nothing finished has to be cut later to get at it. Sound copper or PEX can stay. If the worn pipe runs through the rest of the house, ask about repiping.

Remodel Plumbing across northern Utah

Based in Lehi, working in nine counties.

Related services

Tell us what is going on

Call or text and a person will answer. Estimates are free.

Office Mon to Fri, 7 am to 6 pm. Emergency line 24/7.